This
fast track project provided Fred Meyer, Inc. with a highly
mechanized 313,000 square foot flow-through facility for
domestic and imported products. The facility, located
in Chehalis, Washington, was completed in less than 12
months from definition of need to commissioning. Epstein's
fully integrated project team provided site selection,
site master planning and site design, consulting on material
handling systems and operating procedures, facility design
from concept to construction drawings, approvals from
local authorities, schedule and cost control, and coordination
of all contractors.
|
|
|
  
|
|
|