Who We AreWhat We DoPortfolioContact UsCareer OpportunitiesNews


         
   

Epstein was responsible for preparing construction documents for a 16” diameter sediment discharge line at South Water Purification Plant in Chicago, Illinois. The various design elements of the project included a 16” sediment discharge line, various size pumps including a 5000 GPM transfer pump, piping connections, valves, flow meters, expansion joints, a sampling system, electrical wiring, automatic instrumentation and controls with remote monitoring of operating conditions, resolution of utility conditions, sewer connections, and various coordination and permitting work, including EPA sewer and water permitting.

Lakeshore EastCDOSIDOT

Back To Portfolio