Epstein
was responsible for preparing construction documents
for a 16” diameter sediment discharge line at
South Water Purification Plant in Chicago, Illinois.
The various design elements of the project included
a 16” sediment discharge line, various size pumps
including a 5000 GPM transfer pump, piping connections,
valves, flow meters, expansion joints, a sampling system,
electrical wiring, automatic instrumentation and controls
with remote monitoring of operating conditions, resolution
of utility conditions, sewer connections, and various
coordination and permitting work, including EPA sewer
and water permitting.
|